Day 11 (July 13, 2008)
Subfame was installed. Frame connecters were installed. Front sheet metal was welded onto front subframe.
Day 12 (July 14, 2008)
Car stripping was completed. Original front bulk head was removed. Fire wall flange was bent.
Day 13 (July 18, 2008)
Went to Super Chevy to pick up parts. Engine was removed from Blue Datsun. Metal was removed from inner fenders.
Day 14 (July 19, 2008)
Engine and transmission were put in Bug. Engine mount and transmission cross member were made. Template for fire wall was made.
Day 15 (July 20, 2008)
The bug was sanded, cleaned, and painted with primer.
DAYS 16-20 >> http://cam777.synthasite.com/days-16-20.php