Day 21 (July 27, 2008)
Floor in front of cross member was put in. Box tubing was jacked into place and welded to the floor piece. Rear was clearanced.
Day 22 (July 29, 2008)
Rear floor of car was cleaned and primed.
Day 23 (July 31, 2008)
Rear roof of car was cleaned and primed. Hood scoop was stripped and primed.
Day 24 (August 1, 2008)
Front floor was made and installed.
Day 25 (August 2, 2008)
Heavy welding was completed under car. Front jack point was made. Clearance pockets for upper A-arms were made. Right firewall was installed.