Day 51 (August 29, 2008)
Brakes were bled. Double 90 stainless steal scrap fuel line was fabricated and installed next to radiator to complete the coolant lines. Dave put in rear window glass. Gage holes were cut in dash. Sway bar and bushings were put under front end, but not connected. Temperature wiring and gages were mocked up to start car. Car first fired at 8:20pm. After replacing a bad transmission cooler line, the bug was refired, and car moved on its own for the first time at 8:33pm. (2 monthes to the day after starting the project)
Day 52 (August 31, 2008)
Major set back. A lot of time and momentum were lost in finding a new radiator, because the old one was bad. A scirocco radiator was used from the $2005 Fiat. New mounts were made to install the radiator.
Day 53 (September 1, 2008)
Paula and Calvin worked on the sunroof.
Day 54 (September 3, 2008)
Column switch and NSS were worked on. Jason worked on the sway bar mounts.
Day 55 (September 4, 2008)
Shifter cover/ Switch panel was made.
DAYS 56-60 >> http://cam777.synthasite.com/days-56-60.php