Day 41 (August 19, 2008)

Steering linkage was completed. Seat mounts were completed.

Day 42 (August 20, 2008)

Jason finished welding up hood. Safety net brackets were mounted. Role bar gussets were mounted. Steering wheel was reinstalled. Floor boards were patched. Seat belt mounts were mounted.

Day 43 (August 21, 2008)

Trunk lid was put back on car. Front floor was painted. Rotors were removed. Jason sanded first coat of bondo on hood.

Day 44 (August 22, 2008)

Terry cut rotors. Calvin made the right side dash firewall panel. Cross member was cleaned primed and painted by Paula.

Day 45 (August 23, 2008)

Brake pedal was finished. Master cylinder was mounted. Gas pedal was fabricated and mounted. Front brake disks were cleaned and remounted. Seat was reinstalled. Body work on hood was finished by Jason. Transmission dip stick tube was fixed. Terry mounted slicks.