Day 56 (September 5,2008)

Hood stiffener was installed.

Day 57 (September 6, 2008)

ON/OFF switch, master disconnect were mounted. Switch panel wiring was begun.

Day 58 (September 7, 2008)

Bernie worked on sway bar mounts. Tom made a spacer. Cameron mounted the overflow. Calvin worked on the filler panels. Andy and Paula worked on the wiring.

Day 59 (September 8, 2008)

Wiring, wiring, and more wiring…

Day 60 (September 9, 2008)

Floor was completely painted.